Changi Airport Terminal 4

  • Changi Airport Terminal 4
  • Changi Airport Terminal 4
  • Changi Airport Terminal 4
  • Changi Airport Terminal 4
  • Changi Airport Terminal 4
  • Changi Airport Terminal 4

Changi Airport Terminal 4

Located along the Airport Boulevard, two kilometers away from the Changi Airport’s three main terminals, the new Terminal 4 will be a two-storey, 25m high building with a gross floor area of 195,000m2 and about seven times the size of the former Budget Terminal. holly / yingying

Our work involved the excavation for the construction of the Main Terminal Building and supporting land side infrastructures such as the Taxi Holding Area, Multi-Storey Car Park, Mechanical & Electrical Block and Underpass. Our involvement at air side includes substructure excavation for the construction of Gangway and a dedicated 68m high Ramp Control Tower.

Project details
  • Project Title:Proposed Erection of a 3-Storey Airport Terminal Building (Terminal 4) with 2 Mezzanine Floors, a Basement and a Departure Holding Area, a 5-Storey Multi-Storey Carpark, a 2- Storey Taxi Holding Area, 2 Overhead Vehicular Bridge and a Pedestrian Overhead Bridge
  • Client:Changi Airport Group (Singapore) Pte Ltd
  • Consultant:Changi Airport Group Planners & Engineers
  • Main Contractor:Takenaka Corporation
  • Excavation Quantity:210,000m3